August, 2014

August 23 OPAF Update – Court of Appeal for Ontario date is set

August 23, 2014 Borys Holowacz Latest Posts

The big news is that we have a date for the PECFN appeal of the Divisional Court Decision.  The appeal will be heard on December 8-9 at Osgoode Hall in Toronto.  This is the final appeal open to us to prevent Gilead Power and the Ministry of the Environment’s plan to put wind turbines on […]

More

OSTRANDER POINT INDUSTRIAL WIND TURBINE PROJECT

August 16, 2014 Borys Holowacz Latest Posts

Article presented by the Prince Edward Point Bird Observatory and Prince Edward County Field Naturalists “This project is the most egregious example of a renewable energy project that is simply located in the wrong place”.  Ted Cheskey, Nature Canada Ostrander Point Crown Land is in the centre of the Prince Edward County South Shore Important […]

More

Press Release – August 12, 2014 – PECFN’s first Bio Blitz a resounding success

August 12, 2014 Borys Holowacz Latest Posts

Picton:  Ostrander Point was swarming with nature lovers on the weekend.  Over sixty individuals helped PECFN collect information about animals, birds, plants, insects, amphibians and reptiles on the Crown Land Block.  Tanya Pulfer Ontario Nature’s Reptile and Amphibian Atlas coordinator joined Dr. Paul Catling, alvar specialist, Ted Cheskey Manager of Avian Conservation at Nature Canada […]

More

Participate in PECFN’s BioBlitz at Ostrander Point, August 9-10, 2014

August 6, 2014 Borys Holowacz Latest Posts

Public invited to help inventory the biologically significant Ostrander Point. No experience is necessary. Come for an hour, an afternoon, an evening, a day or for both days. The Prince Edward County Field Naturalists are hosting the county’s first ever BioBlitz at Ostrander Point. The event runs over a 24 hour period from noon on […]

More

Powered by http://wordpress.org/ and http://www.hqpremiumthemes.com/